Astitva Raj
It connects the national capital with Haryana border.
Length of the expressway is 28.5 Km.
Four-level interchanges will be constructed at three locations: Shiv Murti, Yashobhoomi in Dwarka, and the approach to IMT Manesar in Gurgaon.
The tunnel is a three-lane passage stretching 2.3 kilometers, linking Terminal 3 of IGI Airport to the road from Mahilapur.
In the expressway's Delhi section near the IGI airport, there is a 3.6-kilometre-long 'shallow tunnel'.
.
The 19-Km elevated route on the expressway is 34 meter wide and has 8 lanes.
.
Three-Fourth of the route in the Dwarka expressway is at elevation.
.